KOCOBUILDING HARDWARE

Buying guides

Conduit, cable tray and supports: prepare a complete enquiry

Separate the cable route, connection fittings and support assembly so the quotation can cover the intended package.

Start with the routing drawing and approved dimensions. List conduit or tray lengths, bends and transitions, matching fittings and the support arrangement separately. A straight-length quantity alone does not define a complete installation package.

Identify the route and environment

Mark the floor or area, route changes, mounting surface and access requirements on the drawing.

  • Specify conduit material and dimensions, or tray type, width, depth and finish.
  • Include indoor/outdoor exposure and the project’s required technical documents.

Describe each connection

Manufacturer ranges include their own couplers, fittings and mounting components. A nominal size alone is not a complete interface specification.

  • Give thread or connection type and the series being matched.
  • List bends, tees, risers, reducers, covers, dividers and box entries where specified.

Count the package in the right units

Keep straight lengths in metres and discrete fittings in pieces or sets. Use the project support detail rather than inventing spacing.

  • Separate channels, rods, plates, nuts, clamps and building fixings.
  • Provide cut or stock lengths, quantities, delivery point and required date.

Route components are not the same purchasing line

Route components are not the same purchasing line
ComponentKey enquiry detailsMatching items to identify
ConduitMaterial, dimensions and connection systemCouplers, bends, adaptors and boxes
Cable trayType, width/depth, length, finish and drawingBends, risers, couplers, covers or dividers
Support assemblySection, holes, lengths and approved detailRods, nuts, plates, clamps and fixings
Transition or entryConnection drawing and interface dimensionsSpecified connector, entry fitting or edge accessory

A blank list for the route hardware

Download a blank spreadsheet list for conduit, tray, fittings and support parts. Copy or remove component rows to match the package you need.

Fill in dimensions, interfaces, quantities and units from the approved drawings and material schedule. No size, spacing, load rating, price or availability is preselected. This is a purchasing checklist, not an engineering design.

Download the blank CSV

CSV for Excel or another spreadsheet. Only component labels are prepared; the project fields are blank.

Questions about this guide

Does a tray length include all fittings?

List the required fittings separately, or provide a drawing and ask the quotation to identify exactly what is included.

Can same-size conduit fittings be mixed?

Confirm the connection type, dimensions and product system. A matching nominal size does not by itself confirm the interface.

Can this guide set tray width or support spacing?

Use the project design and the selected system’s technical requirements. Send those details with the enquiry; this guide does not design the route or supports.

Technical references

These references explain product construction or planning details. They do not identify KOCO as an authorised dealer or certify a product offered through this catalogue.

Related catalogue categories

Send the specification you need
Browse productsRequest a quote